Galleries
Documenting the work going on and the people involved was an integral part of the Footprint Project, and there are now some excellent images with which to tell the story. The Courses and Volunteers gallery shows the training events that saw the car tyre foundations built, the straw walls put up, the roof started, and the walls plastered with lime on the outside and clay on the inside. This gallery also shows images from the volunteer activities which helped a lot of the work move on.
The General gallery shows some of the other key events during construction, general building site pictures and some of the detail of the building; the Timeline gallery is just that, changes on the site between March 2006 and April 2007, and the Estate gallery shows why St Catherine's is such a fantastic place.